Progress wise Report Summary of NET Metering

TSSPDCL » Circle :
SL.NO Circle Total NET Meter
Registrations
Total NET Meter
Proposed Capacity
( in KW)
Technical Feasibility Issued
for No. of Registrations
Technical Feasibility Issued
for Total Proposed Capacity( in KW)
Registrations
Yet To be Released
Capacity Yet To be
Released
( in KW)
Released Released
Capacity ( in KW)
1 2 3=(7+9) 4=(8+10) 5 6 7 8 9 10
1 HYDERABAD CENTRAL 130 2198 123 1976 25 666 105 1532
2 HYDERABAD NORTH 522 7329.5 503 7219.5 120 3157 402 4172.5
3 HYDERABAD SOUTH 96 2113 92 1950 30 292 66 1821
4 MAHABOOBNAGAR 12 273.9 11 268.9 4 19 8 254.9
5 MEDAK 69 7063 53 5442 30 5102 39 1961
6 NALGONDA 48 3648 39 1506 16 2448 32 1200
7 RANGA REDDY EAST 288 7860.5 258 5637.5 111 5391 177 2469.5
8 RANGA REDDY NORTH 246 7227.5 225 5980.5 99 4474 147 2753.5
9 RANGA REDDY SOUTH 235 8652.5 224 7608.5 47 3890 188 4762.5
10 SIDDIPET 7 228 7 228 2 103 5 125
11 TOTAL 1653 46593.9 1535 37816.9 484 25542 1169 21051.9