Stipulate that charged electrical connections (for all voltages-Low/High/Extra High Tension) along with Chief Electrical Inspector General(CEIG) approval (wherever required) is provided within: :
1.Seven days(where no 'Right of Way'(RoW) is required)
2. Fifteen days where RoW is required from concerned agencies
|
Instructions were issued vide Circular Memo No.CGM(COMML)/SE(C)/DE(C)/ADE-I/DNo2262/18Dt:31.12.2018 |